期刊文献+

矿区专用铁路开采沉陷预计及治理系统研究 被引量:4

Study on the Forecasting and Maintenance System of Special Railway Subsidence in Mine Area
下载PDF
导出
摘要 在矿区铁路下进行放顶煤开采所引起的地表及铁路的变形量大,变形速度快,从而导致矿区铁路维护困难。如果在开采前及开采过程中对地表及铁路的变形预计不准确,维修措施不当,将无法保证矿区铁路的正常运输,甚至出现安全行车事故。为此,研究开发了综采放顶煤条件下铁路开采沉陷预计及其治理系统,该系统通过对地表及铁路的变形进行较为准确的预计,可提出铁路线路及道岔的维修治理措施。 The fully mechanized caving coal mining under the railway in mine area will result in difficult maintenance of railway because of great deformation and subsidence speed of terrene and railway. If the deformation forecasting of terrene and railwayis incorrect and maintenance measure is not suitable in the preceding and the process of mining, the normal operation of the railway in mine area will not be ensured and perhaps the safety accident will take place. Therefore, the railway subsidence forecasting and maintenance system for fully mechanized coal caving was studied and developed. Based on the accurate deformation and subsidence forecasting of the terrene and railway, the maintenance measure for track and switch turnout in railway is put forward in this system.
出处 《矿业研究与开发》 CAS 2004年第3期25-27,共3页 Mining Research and Development
关键词 矿区铁路 综采放顶煤 开采沉陷 塌陷治理 数据库 Abstract: Key Words: Special railway in mine area, Fully mechanized coal caving, Mining subsidence, Control of subsidence, Date base
  • 相关文献

参考文献1

二级参考文献5

  • 1杨叔子 吴雅.时间序列分析的工程应用(上、下)[M].武汉:华中理工大学出版社,1993..
  • 2邓自立 郭一新.单变量ARMAX模型的结构辨识[J].控制理论与应用,1985,(3).
  • 3杨叔子,时间序列分析的工程应用.上,1993年
  • 4邓自立,控制理论与应用,1985年,3期
  • 5Wu S M,Modeling and Applications,1979年

共引文献33

同被引文献22

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部