摘要
从《建设工程工程量清单计价规范》(GB50500-2003)的发布及实施引出了在工程量清单计价模式下,施工企业将受到哪些影响,应采取何种对策,并重点对在工程量清单计价模式下如何进行合理的投标报价进行了研究探讨.
After “Code of Prices for Project Items” ha s been issued,many construction corporations adopt the bill-of-quantity model. This paper discusses its influence on corporations and the measures they should take. The paper especially studies the ways to bid effectively under the bill-of -quantity model.
出处
《绍兴文理学院学报(自然科学版)》
2004年第8期60-63,共4页
Journal of Shaoxing College of Arts and Sciences