摘要
在对个旧锡矿5号矿体进行充分分析和研究的基础上,通过专业的矿床建模软件,运用地质统计学原理,在个旧锡矿以5号矿体为例首次建立了矿床数学 经济模型,实现了矿床的三维立体可视化、动态多方案圈定矿体和储量计算、资料数据的动态查询,为矿山生产计算机管理和改造传统的生产和技术工艺提供了成功的范例。
On the basis of systematic analysis of and research on No. 5 orebody, via the special deposit-model software, with the theory of geostatistics, the mathematic-economical model of the deposit in the Gejiu tin mine has been established. As a result, 3D visibility, dynamic delineation of orebody and calculation of reserves, dynamic query of data have been realized, a successful example has been set for the computer management of mining production and the reconstruction of traditional technology.
出处
《矿物学报》
CAS
CSCD
北大核心
2004年第2期171-175,共5页
Acta Mineralogica Sinica
基金
云南省省院省校科技合作项目(编号:2000YK 05)