期刊文献+

两种浅埋暗挖法开挖地铁车站的比较 被引量:4

Comparative Analysis of Two Different Excavation Methods of Subway Station
下载PDF
导出
摘要 在地下结构中,开挖方式对地表沉降和结构稳定影响很大.为了选取更合适的开挖方式,采用有限差分程序FLAC对某地的一个地铁车站的两种开挖过程设计方案进行了模拟,分析了开挖后土体和支护的受力情况,发现导洞开挖后,在顶板和底板处产生较大范围的卸载区;轴力和弯矩的最大值在拱角或底板的中间;两种开挖方式产生的位移基本相同. In underground structure, excavation method has a great impact on land subsidence and structure stability. In order to choose a more appropriate excavation method, the finite difference procedure FLAC is adopted to simulate the two different excavation process design schemes of a subway station somewhere. The dynamic change of stress in soil and forces in support structure is analyzed. It is found that after the excavation of the adit, a large depressed zone will form in both the roof and the floor. The displacement induced by the adit accounts for almost 60% of the total displacement. The maximum axial force and moment in the support structure occur in the middle of floor or at the conjunction of arch and sidewall. The displacement of the two excavation methods is quite similar. These conclusions provide important reference for the design and construction for the station.
出处 《北京工业大学学报》 CAS CSCD 北大核心 2004年第2期180-184,共5页 Journal of Beijing University of Technology
基金 国家自然科学基金资助项目(40272113/D0214) 北京市自然科学基金资助项目(8022005).
关键词 地铁车站 支护 浅埋暗挖 subway station support underground excavation
  • 相关文献

参考文献4

二级参考文献5

  • 1朱忠隆,硕士学位论文,1998年,45页
  • 2陈仲颐,基础工程手册,1990年,82页
  • 3王锺琦,岩土工程测试技术,1986年,256页
  • 4沈 杰,地基基础手册,1985年,57页
  • 5方从启,王承德.顶管施工中的地面沉降及其估算[J].江苏理工大学学报(自然科学版),1998,19(4):106-110. 被引量:44

共引文献93

同被引文献21

引证文献4

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部