期刊文献+

哈三600MW机组一级过热器减温控制系统改造

Retrofit of Control program of the primary de-superheater for 600 MW Unit in Harbin Third Thermal Power Station
下载PDF
导出
摘要 针对 6 0 0MW机组一级减温系统调节品质不好 ,导致汽温波动较大且经常造成管屏超温 ,影响协调投入效果等问题 ,对一级减温控制系统进行了改进 ,并采取一系列措施对影响汽温波动的制粉系统和风量调节系统进行了改造 。 This article analysis the problem of disqualified steam control of the primary de-superheater. It may result in the deviation of the steam temperature and excess temperature of the panel tubes, moreover, it affects the input adjustment efficiency of the temperature control. A practical method is introduced to improve the structure of the de-superheater and a serial of measures are adopted to improve the pulverized coal system and air control system which affect the temperature deviation. This can indeed improve the economic characteristic and the safety of the system.
出处 《锅炉制造》 2004年第2期46-48,共3页 Boiler Manufacturing
关键词 一级过热器减温控制系统 控制策略 自动投入率 control program of the primary de-superheater control logical-policy automatic input rate
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部