沈阳站主候车室整体改造施工技术 被引量:1

INTEGRAL RENOVATING TECHNOLOGY FOR WAITING ROOM OF SHENYANG RAILWAY STATION
下载PDF
导出
摘要 沈阳站主候车室始建于1908年,其砖木结构已不符合抗震及消防要求,需进行整体改造。将原内部结构体系全部拆除,用新增框架结构体系代替原砖木结构承担全部荷载。原外墙与框架合成整体,既保留了原貌,又满足了结构要求,扩大了使用面积,并改善了使用功能。 Brick-and-timber structure of the main waiting room of Shenyang Railway Station built in 1908 could no longer meet the requirements of seismic and fire resistance. It must be therefore renovated entirely. The old internal structure system is dismantled; and new frame structure system is built to bear the whole load in replacement of the original brick -and -timber structure system. By combining the original external wall and the frame into a monolithic structure, it not only has the original looks preserved, but also satisfies structural requirement, enlarges usable floor area and improves operating function.
出处 《建筑技术》 北大核心 2004年第6期421-422,共2页 Architecture Technology
关键词 古旧建筑物 改造 托换技术 ancient building renovation underpinning technology
  • 相关文献

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部