摘要
介绍了4.2MW燃水煤浆热水锅炉的结构、设计运行参数、锅炉的工作过程和先进性。研究结果对水煤浆锅炉的开发与设计提供了可靠的理论依据与数据。
The paper introduced construction, design and operation parameters, work processes and strongpoint of 4.2MW CWM fired hot-water boiler. The study results would provide reliably theoretical basis and datum for the developing and design for CWM boilers.
出处
《工业锅炉》
2004年第3期29-31,共3页
Industrial Boilers
关键词
热水锅炉
水煤浆
设计
Hot Water Boiler
Coal-Water Mixture
Design