期刊文献+

韶关市某特大型滑坡群治理工程后评价

Post-Evaluation of the Treatment Project for a Large-Scale Landslide Group in Shaoguan
下载PDF
导出
摘要 本文建立了针对项目勘查、设计、施工、监理、建设管理特征的滑坡治理工程后评价体系,利用专家打分法对韶关市某特大型滑坡群地质灾害防治工程项目进行了治理后评价,评价结果与实际相符,可为政府及决策管理部门进行地质灾害勘查、设计、施工及监理等管理提供参考。 This paper establishes a post-evaluation system for landslide treatment projects based on the characteristics of project investigation, design, construction, supervision, and construction man-agement. Using expert scoring method, the post-treatment evaluation of a geological disaster prevention and control project for a large-scale landslide group in Shaoguan City is carried out. The results are consistent with the actual situation and can provide references for the government and decision-making management departments to conduct geological disaster survey, design, construction and supervision management.
出处 《地球科学前沿(汉斯)》 2022年第1期63-69,共7页 Advances in Geosciences
  • 相关文献

参考文献11

二级参考文献121

共引文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部