期刊文献+

基于动态优先级算法的RGV调度策略 被引量:1

Dynamic Scheduling Strategy Based on Dynamic Priority Algorithm
下载PDF
导出
摘要 针对自动化仓库中直线型轨道RGV调度问题,以任务完成最多为目标,结合分治算法,提出基于CNC动态优先级的调度算法。该算法综合了就近原则、最短等待时间原则、最短上料时间原则,就RGV的路径选择与故障情况的解决办法给出了比较好的答案。并利用Matlab验证在实例情形下计算8小时内所能加工的最大物料数和最大工作效率,在实例中,通过与自适应遗传算法对比可验证本算法具有良好的有效性。 The core of intelligent RGV dynamic scheduling strategy is to maximize the system efficiency,and priority determination of CNC machining is a powerful guarantee for maximizing efficiency.Based on the dynamic scheduling priority algorithm,this paper sets the priority selection criteria for the workbench by integrating the nearby principle,the shortest waiting time principle and the shortest feeding time principle.And taking the shortest task completion time as the goal,the paper gives a good answer to the path selection and the arrangement of the occurrence of fault in dynamic scheduling.Finally,Matlab is used to verify the maximum number of materials and the maximum working efficiency that can be processed within 8 hours under different cases of instance data.After verification,this strategy has good effectiveness.
作者 颛孙盈
出处 《计算机科学与应用》 2019年第6期1126-1133,共8页 Computer Science and Application
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部