摘要
针对重型运载火箭超大直径有效载荷整流罩,进行了卧式装配及立式装配两种工艺方案的研究。分析了传统整流罩卧式铆接装配装备及工艺方法的优缺点,提出了整流罩立式装配装备方案及工艺方案,对比分析得出了立式装配方案应用于重型运载火箭超大直径有效载荷整流罩装配的优势。
Aiming at the assembly of heavy launch vehicle super-large diameter payload fairing,two process schemes of horizontal assembly&vertical assembly are studied.The advantages and disadvantages of traditional horizontal assembly schemes are analyzed.A vertical assembly process scheme is put forward and the advantages of the vertical scheme are obtained by comparative analysis.
出处
《机械工程与技术》
2019年第3期188-193,共6页
Mechanical Engineering and Technology