考虑返工的项目进度缓冲管理框架研究

Research on Buffer Management Framework for Project Schedule Control in Rework Scenarios
下载PDF
导出
摘要 作为项目进度延期的重要原因之一,返工一直以来都是项目管理中的难点。尽管关键链项目管理方法为应对项目进度风险提供了有力的工具,但它假设活动的持续时间是互相独立的,在返工情境下并不适用。此外,活动因潜在返工而拥有的特征也未在进度管理中被利用。因此,本文试图提出一个返工情境下的缓冲管理框架,以填补这块空白。具体来说,本文引入设计结构矩阵来描述活动之间的依赖关系,以更精确地确定缓冲大小;此外,本文利用活动因返工而拥有的敏感性指标对缓冲进行分配,以将管理者有限的注意力集中在最关键的活动上。最终,模拟结果表明,本文提出的缓冲管理框架可以提供更可靠的项目工期估计并获得更高的项目按时完工率。 As a major cause of the prolonged project process, rework has long been a challenge in project management. Although critical chain project management provides a powerful tool for dealing with schedule risks, it assumes activities’ durations are independent of each other, which is inappropriate in rework situations. Besides, activities’ features that arising from potential rework are not utilized in schedule management. Hence, this paper tries to propose a buffer management framework in rework scenarios to fill the gap. Specifically, a design structure matrix is introduced to depict activities’ dependencies, thus the buffer size can be determined more precisely. Meanwhile, a sensitivity indicator related to rework is applied to allocate buffer, thus managers’ attention can be focused on the most critical activities. Finally, the simulation result demonstrates that the proposed framework in this paper can provide a more reliable estimate of the project duration and obtain a higher on-time completion rate.
作者 徐晶 马国丰
出处 《管理科学与工程》 2024年第2期428-441,共14页 Management Science and Engineering
  • 相关文献

参考文献2

二级参考文献56

  • 1刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 2马国丰,尤建新,杜学美.识别关键冲突任务的定量分析[J].上海交通大学学报,2006,40(4):669-671. 被引量:11
  • 3刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 4高德拉特.关键链[M].罗嘉颖译.北京:电子工业出版社,2006.
  • 5Newbold,R. C.. Project Management in the Fast Lane- Applying the Theory of Constraints[M]. Boca Raton: The St Lucie Press, 1998.
  • 6Leach, L. P.. Critical Chain Project Management, Second edition.[M]. London: Artech House Inc, 2005.
  • 7Herroelen,W. , Leus,R.. On the merits and pitfalls of eritical chain scheduling [J]. Journal of Operations Management, 2001, 19(5) : 559-577.
  • 8Tukel,O. I. , Rom,W. O. , Eksioglu,S. D.. An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006, 172(2): 401-416.
  • 9Rabbani,M. , Ghomi,S. M. T. , Jolai,F. , Lahiji,N. S.. A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept [J]. European Journal of Operational Research, 2007, 176(2) : 794-808.
  • 10Blackstone,J. H. , Cox,J. F. , Schleier,J. G.. A tutorial on project management from a theory of constraints perspective [J]. International Journal of Product Research, 2009, 47(24): 7029- 7046.

共引文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部