期刊文献+

施工模块划分技术在塔里木盆地复杂山地地震勘探中的应用

Application of Construction Module Division Technology in the Seismic Exploration of Complex Mountainous Regions in the Tarim Basin
下载PDF
导出
摘要 塔里木盆地地处天山山脉、昆仑山脉和阿尔金山脉之间,油气资源丰富。随着石油勘探程度的加深,勘探目标向盆地边缘山前带和山地转移。山地地形十分恶劣、交通条件极差,给地震勘探野外采集施工作业带来极大的安全风险。如何降低施工中设备搬迁和人员行走的风险,是本文写作的主要目的。本文介绍了施工模块划分技术在塔里木盆地帕米尔高原的勘探施工中,降低作业风险的应用实例,为塔里木盆地高难山地地震采集施工开辟了一条有效途径。 The Tarim Basin is located between the Tianshan Mountains, Kunlun Mountains and Altun Mountains and is rich in oil and gas resources. With the deepening of oil exploration, the exploration targets have shifted to the piedmont and mountainous areas on the edge of the basin. Because the mountain terrain is very bad and the traffic conditions are extremely poor, it brings great safety risks to the seismic exploration field acquisition and construction operations. How to reduce the risk of equipment removal and personnel walking during construction is the main purpose of this article. This article introduces the application examples of the construction module division technology in the exploration and construction of the Pamir Plateau in the Tarim Basin to reduce the operation risk, which opens up an effective way for the seismic acquisition and construction of the high-difficult mountainous area in the Tarim Basin.
出处 《自然科学》 2022年第1期45-52,共8页 Open Journal of Nature Science
  • 相关文献

参考文献6

二级参考文献53

共引文献369

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部