摘要
电力工程项目物资JIT(Just in Time)管控,将JIT思想带入到了工程建设过程中,保证了项目物资的准时送达,提升了项目的整体效益。但是目前企业施行的工程项目JIT管控仍处于初级阶段,其相对应的准时率评价也不完善。本文在分析评价指标体系构建的基础上,结合实际情况,设计科学合理的准时率评价方法,并以S电网公司的实际数据为算例,验证评价方法的可行性。
Project supplies JIT (Just in Time) controls, bring JIT thoughts to the project construction process to ensure the on Time delivery of project materials, and promote the overall benefits of the project. But at present, the enterprise’s JIT project control is still in its infancy, so its corresponding evalu-ation on time rate is not perfect. Based on the analysis of the construction of the evaluation index system principles and combined with the actual situation, the article designs a scientific and rea-sonable evaluation method on time rate, and takes the real data of South Power Grid Corp for ex-ample, to verify the feasibility of the evaluation method.
基金
中国南方电网集团有限公司合作项目《项目物质JIT评价体系研究》资助,合同号:CSG[2014]0302WZ9。