摘要
“邛海湾”项目工程B4标段施工组织设计方案是在工程开工前施工单位制作的,指导工程合理、有序进行。该重点工程项目主体施工组织设计根据当地特殊自然地理气候条件、工程设计标准文件和工程建设单位相关要求等,采用流水施工方法,分为3个施工段,通过合理利用土地资源、合理布置场地、合理有序进行施工,并编制大模板专项施工方案,确保工程顺利完成,达到工程质量、标准化统一施工、效果最佳。
The construction organization plan of the B4 section of “Qionghai Bay” project is compiled by the construction unit before the commencement of the project, which guides the project in a rational and orderly manner. The main construction organization design of the key project according to the local special natural geographical and climatic conditions, engineering design standard documents and engineering construction units related requirements, using water construction method, divid-ed into three construction sections. Through rational utilization of resources, rational layout of sites, reasonable and orderly construction, and the preparation of special construction plans for large formwork, the quality and standardization of construction will be ensured and effect is the best.