摘要
Through the long time track examination and disintegration to SF6 circuit breaker, we obtain the massive monitor data and massive pictures. The criteria of resuming insulation discharge failure conforming to CSO2/CH2S>7, is quite broad to SO2 and the H2S concentration permission. Even if it reaches 100μL/L, it will not be in danger immediately to the safe operation of equipment. We may plan, arrange, and overhaul calmly. When obtaining the bare conductor overheating failure, it has not involved the resuming insulation. We may use the resuming insulation discharge failure criterion.
Through the long time track examination and disintegration to SF6 circuit breaker, we obtain the massive monitor data and massive pictures. The criteria of resuming insulation discharge failure conforming to CSO2/CH2S>7, is quite broad to SO2 and the H2S concentration permission. Even if it reaches 100μL/L, it will not be in danger immediately to the safe operation of equipment. We may plan, arrange, and overhaul calmly. When obtaining the bare conductor overheating failure, it has not involved the resuming insulation. We may use the resuming insulation discharge failure criterion.