摘要
This paper presents an auxiliary planning method for intelligent substation access system based on security region. Firstly, the method of resolving the static voltage security region is proposed. Secondly, the method of constructing the optimal index of substation accession is given, which is used to describe the priority of the node into the substation. Finally, a complete set of intelligent substation access system auxiliary planning strategy is given, which takes into account the constraints of the normal operation of the grid on the voltage amplitude.
This paper presents an auxiliary planning method for intelligent substation access system based on security region. Firstly, the method of resolving the static voltage security region is proposed. Secondly, the method of constructing the optimal index of substation accession is given, which is used to describe the priority of the node into the substation. Finally, a complete set of intelligent substation access system auxiliary planning strategy is given, which takes into account the constraints of the normal operation of the grid on the voltage amplitude.