摘要
Ghanaian construction projects encounter a number of challenges, including low health, safety, and environmental requirements, poor performance, and time and cost overruns. To provide value for money (VFM) on government infrastructure projects in Ghana, this research assesses the roles of project consultants, specifically architects and quantity surveyors, and highlights important obstacles. A cross-sectional survey design involving architects and quantity surveyors yielded a 96% response rate after 100 questionnaires were distributed. Consultants’ responsibilities also include monitoring standards compliance, providing advice on delays, controlling budgets, and advising on project completion dates. Difficulties encompass a lack of promptness in decision-making, unethical conduct, political pressure, and inadequate focus on contract administration and construction audits. Project urgency, longevity, political clout, timely decision-making, and team experience are important variables that impact VFM. Policy makers and construction management practitioners should take note of the implications for Ghana’s public infrastructure projects.
Ghanaian construction projects encounter a number of challenges, including low health, safety, and environmental requirements, poor performance, and time and cost overruns. To provide value for money (VFM) on government infrastructure projects in Ghana, this research assesses the roles of project consultants, specifically architects and quantity surveyors, and highlights important obstacles. A cross-sectional survey design involving architects and quantity surveyors yielded a 96% response rate after 100 questionnaires were distributed. Consultants’ responsibilities also include monitoring standards compliance, providing advice on delays, controlling budgets, and advising on project completion dates. Difficulties encompass a lack of promptness in decision-making, unethical conduct, political pressure, and inadequate focus on contract administration and construction audits. Project urgency, longevity, political clout, timely decision-making, and team experience are important variables that impact VFM. Policy makers and construction management practitioners should take note of the implications for Ghana’s public infrastructure projects.
作者
Sheitu Abu
Nongiba Alkanam Kheni
Adams Abudi
Sheitu Abu;Nongiba Alkanam Kheni;Adams Abudi(Department of Technical and Vocational Education, Mampong Technical College of Education, Mampong, Ghana;Department of Construction, Akenten Appiah-Menka University of Skills Training and Entrepreneurial Development, Kumasi, Ghana;Department of Technical and Vocational Education, Bagabaga Training College, Tamale, Ghana)