期刊文献+

Harmonic Contributions of Utility and Customer Based on Load Model Using Field Measurements

下载PDF
导出
摘要 In recent years, sinusoidal waveform of the current and voltage disturbs in the electrical distribution system because of the due to the increasing number of non-linear loads. Many standards of IEC and IEEE standards have been published in order to limit the voltage and current waveform distortion. The operators of the electricity distribution network widely use the power quality monitoring systems at the point of common connection (PCC). It has been identified that there are substantial number of harmonic currents excess of the standards transferred to the grid according to the data obtained from power quality monitoring systems. In case of exceeding the limits specified in the standards, there is a need to determine the network and customer responsibilities for the implementation of required sanctions. In this study, using recorded data at the PCC of a medium voltage electrical distribution system, voltage and current harmonic distortion responsibilities of the network and customer are determined by the improved harmonic current vector method. Up-to-date load model based on field measurement which provides more accurate results has been used instead of the constant load impedance in the proposed method. In recent years, sinusoidal waveform of the current and voltage disturbs in the electrical distribution system because of the due to the increasing number of non-linear loads. Many standards of IEC and IEEE standards have been published in order to limit the voltage and current waveform distortion. The operators of the electricity distribution network widely use the power quality monitoring systems at the point of common connection (PCC). It has been identified that there are substantial number of harmonic currents excess of the standards transferred to the grid according to the data obtained from power quality monitoring systems. In case of exceeding the limits specified in the standards, there is a need to determine the network and customer responsibilities for the implementation of required sanctions. In this study, using recorded data at the PCC of a medium voltage electrical distribution system, voltage and current harmonic distortion responsibilities of the network and customer are determined by the improved harmonic current vector method. Up-to-date load model based on field measurement which provides more accurate results has been used instead of the constant load impedance in the proposed method.
出处 《Journal of Power and Energy Engineering》 2015年第5期11-28,共18页 电力能源(英文)
基金 This study has been financially supported by TUBITAK with 110E134 project number.
  • 相关文献

参考文献1

二级参考文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部