期刊文献+

Study and Application of Horizontal Well Productivity Formula with Continuous Time-Varying Considered 被引量:2

Study and Application of Horizontal Well Productivity Formula with Continuous Time-Varying Considered
下载PDF
导出
摘要 The horizontal well technology has been widely applied to enhanced oil recovery for low permeability and heavy oil reservoir. It is the important basis for designing and optimizing horizontal well to determine the productivity. The productivity determination of horizontal wells in offshore oil fields is mainly based on the actual productivity data of producing directional wells in the similar reservoirs nearby. Considering pressure drop and oil layer thickness to calculate the productivity, this method lacks certain theoretical basis and requires rich working experience for reservoir engineers. The other method is Joshi Formula which needs the known horizontal well control radius to be known. But the control radius is man-made at certain degree. In order to address the shortcomings of existing methods, a new reservoir engineering method was proposed to determine the horizontal well productivity formula, horizontal flow pattern and control radius based on the principle of equivalent flow resistance and conformal transformation. This method has overcome the disadvantage of determining on person. It provided some theoretical basis for getting the horizontal well productivity and is of some guiding meaning for evaluating the productivity of adjustment wells and development wells. The horizontal well technology has been widely applied to enhanced oil recovery for low permeability and heavy oil reservoir. It is the important basis for designing and optimizing horizontal well to determine the productivity. The productivity determination of horizontal wells in offshore oil fields is mainly based on the actual productivity data of producing directional wells in the similar reservoirs nearby. Considering pressure drop and oil layer thickness to calculate the productivity, this method lacks certain theoretical basis and requires rich working experience for reservoir engineers. The other method is Joshi Formula which needs the known horizontal well control radius to be known. But the control radius is man-made at certain degree. In order to address the shortcomings of existing methods, a new reservoir engineering method was proposed to determine the horizontal well productivity formula, horizontal flow pattern and control radius based on the principle of equivalent flow resistance and conformal transformation. This method has overcome the disadvantage of determining on person. It provided some theoretical basis for getting the horizontal well productivity and is of some guiding meaning for evaluating the productivity of adjustment wells and development wells.
出处 《Journal of Power and Energy Engineering》 2018年第9期32-39,共8页 电力能源(英文)
关键词 Horizontal Well Principle of EQUIVALENT Flow Resistance CONFORMAL Transformation Control RADIUS Pseudo-Steady State Time Horizontal Well Principle of Equivalent Flow Resistance Conformal Transformation Control Radius Pseudo-Steady State Time
  • 相关文献

参考文献7

二级参考文献83

共引文献270

同被引文献3

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部