A Linear Programming Approach for Parallel Cell Scheduling with Sequence-Dependent Setup Times

下载PDF
导出
摘要 In this study, we consider the problem of scheduling a set of jobs with sequence-dependent setup times on a set of parallel production cells. The objective of this study is to minimize the total completion time. We note that total customer demands for each type should be satisfied, and total required production time in each cell cannot exceed the capacity of the cell. This problem is formulated as an integer programming model and an interface is designed to provide integrity between data and software. Mathematical model is tested by both randomly generated data set and real-world data set from a factory that produce automotive components. As a result of this study, the solution which gives the best alternative production schedule is obtained. In this study, we consider the problem of scheduling a set of jobs with sequence-dependent setup times on a set of parallel production cells. The objective of this study is to minimize the total completion time. We note that total customer demands for each type should be satisfied, and total required production time in each cell cannot exceed the capacity of the cell. This problem is formulated as an integer programming model and an interface is designed to provide integrity between data and software. Mathematical model is tested by both randomly generated data set and real-world data set from a factory that produce automotive components. As a result of this study, the solution which gives the best alternative production schedule is obtained.
出处 《American Journal of Operations Research》 2014年第3期155-163,共9页 美国运筹学期刊(英文)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部