期刊文献+

Energy Portfolio Management with Entry Decisions over an Infinite Horizon

Energy Portfolio Management with Entry Decisions over an Infinite Horizon
下载PDF
导出
摘要 We study a firm that has a conventional plant and considers introducing a new plant as an alternative to generate electricity. The firm’s decision includes the optimal entry time for the new plant, and the optimal dispatch between the existing plant and the new plant after it has been constructed to maximize the expected profit over an infinite time horizon. Under geometric Brownian motion, we formulate the problems as non-regular mixed optimal stopping/control problem. Due to the intractability of the mixed problem, we decompose it into two auxiliary problems, and characterize the optimal strategies in closed-form by standard value-matching and smooth-pasting conditions. Our numerical example confirms our theoretical results. We study a firm that has a conventional plant and considers introducing a new plant as an alternative to generate electricity. The firm’s decision includes the optimal entry time for the new plant, and the optimal dispatch between the existing plant and the new plant after it has been constructed to maximize the expected profit over an infinite time horizon. Under geometric Brownian motion, we formulate the problems as non-regular mixed optimal stopping/control problem. Due to the intractability of the mixed problem, we decompose it into two auxiliary problems, and characterize the optimal strategies in closed-form by standard value-matching and smooth-pasting conditions. Our numerical example confirms our theoretical results.
作者 Zhen Liu
出处 《Applied Mathematics》 2012年第7期760-764,共5页 应用数学(英文)
关键词 ENERGY PORTFOLIO Management GEOMETRIC BROWNIAN Motion Optimal STOPPING Energy Portfolio Management Geometric Brownian Motion Optimal Stopping
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部