期刊文献+

Dam Breach Analysis Using HEC-RAS and HEC-GeoRAS: The Case of Kesem Kebena Dam 被引量:1

Dam Breach Analysis Using HEC-RAS and HEC-GeoRAS: The Case of Kesem Kebena Dam
下载PDF
导出
摘要 Ethiopia has been booming with active construction of dams within the past few decades for different infrastructural needs, but has never experienced demolition or failure of dams in its history;hence little attention is being given to possible breach scenarios of dams and the resulting floodings. This paper makes analysis of the possible breach of kesem dam and the resulting flood inundation. In this study, the dam has been checked for both overtopping and piping failure modes using one dimensional river analysis model called HEC-RAS. Empirical equations were used to predict dam breach parameters of the two failure modes for use in this model. PMF inflow with a peak 9237.77 m3/s is used as an input to the reservoir to check if overtopping failure was possible. The spill way has proven to have adequate capacity for the flood due to the PMF. Therefore, breaching of the embankment was not possible. Piping failure was also simulated in HEC-RAS and the resulting breach due to piping failure, was analyzed and flood hydrograph was obtained at different cross sections along the river. These are flood hydrographs at 20 km, 40 km and 60 km at the downstream. The resulting flood plain was also mapped using HEC-GeoRas to show the extent of flooding. Ethiopia has been booming with active construction of dams within the past few decades for different infrastructural needs, but has never experienced demolition or failure of dams in its history;hence little attention is being given to possible breach scenarios of dams and the resulting floodings. This paper makes analysis of the possible breach of kesem dam and the resulting flood inundation. In this study, the dam has been checked for both overtopping and piping failure modes using one dimensional river analysis model called HEC-RAS. Empirical equations were used to predict dam breach parameters of the two failure modes for use in this model. PMF inflow with a peak 9237.77 m3/s is used as an input to the reservoir to check if overtopping failure was possible. The spill way has proven to have adequate capacity for the flood due to the PMF. Therefore, breaching of the embankment was not possible. Piping failure was also simulated in HEC-RAS and the resulting breach due to piping failure, was analyzed and flood hydrograph was obtained at different cross sections along the river. These are flood hydrographs at 20 km, 40 km and 60 km at the downstream. The resulting flood plain was also mapped using HEC-GeoRas to show the extent of flooding.
出处 《Open Journal of Modern Hydrology》 2019年第4期113-142,共30页 现代水文学期刊(英文)
关键词 DAM Breach ANALYSIS FLOOD MAPPING HEC-RAS HEC-GeoRAS Dam Breach Analysis Flood Mapping HEC-RAS HEC-GeoRAS
  • 相关文献

同被引文献40

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部