Tabu Search Solution for Resource Confidence Considered Partner Selection Problem in Cross-Enterprise Project

Tabu Search Solution for Resource Confidence Considered Partner Selection Problem in Cross-Enterprise Project
下载PDF
导出
摘要 Cross-enterprise project is the main implementation form in multi enterprises collaborative production environment. Minimizing the risk of failure and tardiness caused by the uncertainty of partner’s resources in partner selection is the key problem to ensure success in Cross-enterprise project. In this paper, considering the factors and constraints of sub-project processing times, precedence of sub-project and project due date, especially the resource confidence, a 0-1 integer programming model was presented with the objective to minimize the risk of failure and the tardiness of the project. A project scheduling algorithm was designed to search and evaluate selection solutions, and the project scheduling algorithm was embedded into a Tabu search algorithm to solve the model. Simulation experiments and comparisons with other algorithms showed that the proposed approach was possible to find the optimal solution with a faster speed and higher probability. Cross-enterprise project is the main implementation form in multi enterprises collaborative production environment. Minimizing the risk of failure and tardiness caused by the uncertainty of partner’s resources in partner selection is the key problem to ensure success in Cross-enterprise project. In this paper, considering the factors and constraints of sub-project processing times, precedence of sub-project and project due date, especially the resource confidence, a 0-1 integer programming model was presented with the objective to minimize the risk of failure and the tardiness of the project. A project scheduling algorithm was designed to search and evaluate selection solutions, and the project scheduling algorithm was embedded into a Tabu search algorithm to solve the model. Simulation experiments and comparisons with other algorithms showed that the proposed approach was possible to find the optimal solution with a faster speed and higher probability.
出处 《Journal of Software Engineering and Applications》 2010年第6期548-555,共8页 软件工程与应用(英文)
关键词 Cross-Enterprise PROJECT PARTNER SELECTION RESOURCE CONFIDENCE Tabu SEARCH Cross-Enterprise Project Partner Selection Resource Confidence Tabu Search
  • 相关文献

参考文献1

二级参考文献1

共引文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部