期刊文献+

Analysis of Software Development and Enhancement Projects Work Effort per Unit Based on the COSMIC Method with Regard to Technological Factors—Case Study

Analysis of Software Development and Enhancement Projects Work Effort per Unit Based on the COSMIC Method with Regard to Technological Factors—Case Study
下载PDF
导出
摘要 This paper aims to present a case study that consists in the analysis of work effort per unit of software systems Development and Enhancement Projects (D&EP) depending on technological factors. That analysis was commissioned by one of the largest public institutions in Poland. This is the COSMIC (Common Software Measurement International Consortium) function points method that is chosen by this institution as a point of reference for size of software systems developed/enhanced for supporting its functions and therefore this method is the base for the analysis of D&EP work effort per unit with regard to technological factors. This paper aims to present a case study that consists in the analysis of work effort per unit of software systems Development and Enhancement Projects (D&EP) depending on technological factors. That analysis was commissioned by one of the largest public institutions in Poland. This is the COSMIC (Common Software Measurement International Consortium) function points method that is chosen by this institution as a point of reference for size of software systems developed/enhanced for supporting its functions and therefore this method is the base for the analysis of D&EP work effort per unit with regard to technological factors.
出处 《Journal of Software Engineering and Applications》 2013年第11期597-609,共13页 软件工程与应用(英文)
关键词 Software Systems Development and ENHANCEMENT PROJECTS Work Effort PER UNIT Functional Size Measurement COSMIC METHOD IFPUG METHOD Software Systems Development and Enhancement Projects Work Effort per Unit Functional Size Measurement COSMIC Method IFPUG Method
  • 相关文献

参考文献1

二级参考文献36

  • 1Z. Szyjewski, Metodyki zarzadzania projektami informatycznymi, Methodologies of IT projects management, Placet, Warsaw, 2004.
  • 2Standish Group, CHAOS Summary 2009, West Yarmouth, Mass., 2009.
  • 3T.C. Jones, Patterns of Software Systems Failure and Success, International Thompson Computer Press, Boston, MA, 1995.
  • 4PCG, 2008 ERP Report, Topline results, Panorama Consulting Group, Denver, 2008.
  • 5T.C. Jones, Software project management in the twenty-first century, Software Productivity Research, Burlington, 1999.
  • 6B. Czamacka-Chrobot, The economic importance of business software systems size measurement, in:Proceedings of the 5th International Multi-Conference on Computing in the Global Information Technology (ICCGI 2010), pp. 293-299.
  • 7M.A. Parthasarathy, Practical Software Estimation: Function Point Methods for Insourced and Outsourced Projects, Addison Wesley, 2007.
  • 8ISO/IEC 14143 Information Technology--Software measurement--Functional size measurement--Parts 1-6, ISO, Geneva, 1998-2007.
  • 9Gartner Group, Function points can help measure application size, Research Notes SPA-18-0878, 2002.
  • 10International Software Benchmarking Standards Group, The ISBSG report: software project estimates--how accurate are they?, ISBSG, Hawthorn, VIC, 2005.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部