摘要
在正常运行的飞机场净空区内进行建筑物或构筑物的施工,尤其是建造地下式航空煤油储罐,会面临诸多技术上的困难,对施工管理也提出了较高要求。通过安哥拉夸德罗安达国际机场航空煤油库项目,介绍了机场净空区内航空煤油库的施工管理措施。
The construction of buildings,especially the underground aviation kerosene storage tanks in the operating airport clearance zone faces with a lot of construction technical challenges,it proposes higher requirement for its management.The construction management of the aviation kerosene depot in the airport clearance area is introduced through the aviation kerosene depot project of the international airport of the Luanda,Angola.
出处
《石油天然气学报》
CAS
2019年第4期66-69,共4页
Journal of Oil and Gas Technology