沙特阿美PC总承包模式下的设计管理 被引量:2

Engineering Management for Saudi Aramco Project under PC General Contract Mode
下载PDF
导出
摘要 与传统EPC总承包模式不同,PC总承包作为总承包的一种形式,承包商负责采购和施工工作。但在许多国际项目中、尤其沙特阿美项目中承包商的工作里面往往还涉及大量的设计工作。本文对PC承包模式下的设计工作内容和难点进行了解析,并分别给出在投标阶段、实施阶段和收尾阶段的设计管理要点。对每一过程中经常遇到的问题和经验教训也进行了阐述,为其他类似沙特阿美项目的设计管理提出借鉴。 Different from the traditional EPC mode, PC general contracting is another form of general contracting, and the contractor is responsible for procurement and construction. But in many international projects, especially Saudi Aramco projects, a lot of engineering work is often involved. This paper analyzes the contents and difficulties of the engineering work under the PC contract mode, and gives the key points of the engineering management in the bidding stage, the implementation stage and the closing stage respectively. The problems and lessons often encountered in each process are also described, which can be used for reference for engineering management of other similar Saudi Aramco projects.
出处 《石油天然气学报》 CAS 2020年第2期201-207,共7页 Journal of Oil and Gas Technology
关键词 设计管理 PC总承包 沙特阿美 Engineering Management PC Contract Mode Saudi Aramco
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献22

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部