根据近年来成品油管道生产运行数据,结合成品油枢纽站的储罐设置和工艺流程,采用输差法对成品油首站的库容需求进行分析,提出成品油枢纽站的优化运行建议及改造方案。
According to the production and operation data of the product oil pipeline in recent years, com-bined with the storage tank setting and process flow of the product oil hub station, the storage capacity demand of the first product oil station is analyzed by using the transmission difference method. The optimization operation suggestions and transformation scheme of the product oil hub station are put forward.