摘要
随着电力事业快速发展,变电站及电网数量、规模都在不断增大,运维人员日常倒闸工作任务量也在增加。对接地线科学装拆,不仅可提高变电所携带型高压接地线的改造设计效率,还可保证操作人员安全,减少安全隐患。本文针对变电所携带型高压接地线改造设计内容进行分析,以期提高供电可靠性和操作安全性。
With the rapid development of power industry, the number and scale of substation and power grid are increasing day by day. The task of daily operation of operation and maintenance personnel is also increasing. In this process, the ground wire scientific assembly and disassembly, not only can improve the substation carrying high-voltage grounding wire design efficiency, but also to ensure the safety of operators to reduce security risks. In this paper, this paper analyzes the design content of the high-voltage grounding wire for the substation, so as to improve the reliability and operational safety of the power supply.
出处
《电子测试》
2017年第6X期90-90,89,共2页
Electronic Test
关键词
变电所
携带型高压接地线
改造设计
substation
portable high-voltage ground wire
transformation design