摘要
描述了CPR1000堆型核电工程项目安装过程中,采用双机抬吊旋转法吊装蒸汽发生器的主要过程、吊装方法和专用吊装设备,并详细介绍了相关的力学计算过程。通过论文的研究与实践应用,可以深入了解核电项目建设过程中大型设备的安装过程,为后续的三代核电项目建设过程中的大型设备吊装提供经验和依据。
This paper describes the CPR1000 reactor type nuclear power project in the installation process, the dual lifting sling swivel lifting the main process of steam generator, hoisting method and special lifting equipment, and details the mechanics calculation process. Through this paper, we can deeply understand the process of nuclear power projects in the construction process of large equipment installation process, for the follow-up of the three generation of nuclear power projects in the construction process of large equipment to provide experience and basis.
出处
《工程建设与设计》
2016年第9期164-166,173,共4页
Construction & Design for Engineering
关键词
蒸汽发生器
双机抬吊旋转法
核电工程
steam generator
double machine lifting and rotating method
nuclear power engineering