3Russell A D, Chlu C, Korde T. Visual representation of construc- tion management data [ J ]. Automation in Construction, 2009, 18(8) :1045 - 1062.
4Koo B, Fischer M. Feasibility study of 4D CAD in commercial construction[ J ]. Journal of Construction Engineering and Man- agcment,2000,126(4) :251 -260.
5Zorriassatine F, Wykes C, Parkin R, et al. A survey of virtual pro- totyping techniques for mechanical product development [ J ]. Proceedings of the Institution of Mechanical Engineers, Part B : Journal of Engineering Manufacture,2003,217 (4) :513 - 530.
6CN-HB7757--2005飞机数字样机通用要求[S].
7Garbade R, Dolezal W R. DMU@ Airbus-evolution of the digital mock-up (DMU) at Airbus to the centre of aircraft develop- ment [ M ]. Krause F. Heidelberg : Sprlnger,2007 : 3 - 12.
8Sun G. A digital mock-up visualization system capable of pro- cessing glga-scale CAD models [ J]. Computer-Aided Design, 2007,39(2) :133 - 141.