摘要
为解决盾构隧道管片下沉超限质量问题,提出采用液压提升法治理方案。以南宁轨道交通1号线某盾构区间洞口管片沉降治理为例,介绍液压提升法的工艺原理、方案设计、作业过程及质量安全保证措施。
Hydraulic lifting treatment scheme was proposed to solve the overlimit settlement of shield tunnel segment.The segment settlement treatment at shield tunnel entrance of Nanning Rail Transit Line 1 was taken as an example to introduce the processing theory,scheme design,operation step,quality and safety guarantee measures of hydraulic lifting method.
出处
《建筑技术》
北大核心
2017年第7期748-751,共4页
Architecture Technology
基金
中国交通建设股份有限公司科研资金项目(2013-ZJKJ-17)
关键词
盾构隧道
管片下沉
液压提升
弧形钢托架
shield tunnel
segment settlement
hydraulic lifting
arch steel bracket