交叉渡线整组换铺施工技术与组织 被引量:2

Construction Technology and Organization of Cross-crossing
下载PDF
导出
摘要 在既有铁路站场改造施工中,交叉渡线整组换铺施工由于施工场地受限、单次封锁要点时间长、对铁路运输影响较大、劳动力及机械设备一次投入多、施工组织困难、技术难度大、安全风险高等因素,一般很少被采用。但在特殊施工条件下,为满足铁路运输的需要,而必须采用整组换铺的施工方案。在贵州六盘水站站改施工中,在成都铁路局首次采用一次封锁要点整组换铺交叉渡线施工技术,并取得圆满成功。 In the transformation of existing railway station construction,cross-crossing the whole group of patchwork construction due to limited construction site,a single block a long time,a greater impact on rail transport,labor and machinery equipment,organizational difficulties,technical difficulty,high risk of security factors,generally rarely used. But in special construction conditions,in order to meet the needs of rail transport,and must use the entire group of paving the construction program. I units in Guizhou Liupanshui Station construction,in the Chengdu Railway Bureau for the first time to use a blockade points for the whole group of cross-crossing crossing construction technology,and a complete success.
作者 刘兴
出处 《建筑技术开发》 2017年第6X期17-18,共2页 Building Technology Development
关键词 交叉渡线 整组换铺 滑轨接长 crossed the line whole set change shop slide joint length
  • 相关文献

参考文献2

二级参考文献3

  • 1TBl353-79.铁路道岔和交叉名词术语[s].
  • 2TB412-90.标准轨距铁路道岔技术条件[s].
  • 3铁道部工务局.铁路工务技术手册:道岔[M].北京:中国铁道出版社,2003.

共引文献2

同被引文献3

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部