摘要
随着我国建设市场的迅猛发展,在工程预结算过程中定额计价模式暴露出越来越多的问题,不适应建筑市场的发展。为此参照国际经验,我国推行的计价模式开始了从定额计价到工程量清单计价模式的转变。分析不可抗力风险,通过案件实例介绍处理过程。
With the rapid development of China's construction market,in the process of pre-settlement pricing model exposing more and more problems,not suited to the development of the construction market.To this end,with reference to international experience,China's pricing model began to change from the fixed pricing to the bill of quantities model changes. Analyze the risk of force majeure,through the case examples to introduce the process.
出处
《建筑技术开发》
2017年第6X期104-105,共2页
Building Technology Development
关键词
清单计价
不可抗力
风险分析
inventory pricing
force majeure
analysis risk