2Thompson G L, Wall D L. A branch and bound model for choosing optimal substation locations[J]. IEEE Trans on Power Apparatus and Systems, 1981,100(5) : 2683-- Z688.
3Haghifam M R,Shahabi M. Optimal location and sizing of HV/MV substation in uncertainty load environment using genetic algorithm[J]. Electric Power Systems Research, 2002,63 (1) : 37-- 50.
4El-Fouly T H M, Zeineldin H H, El-Saadany E F, et al. A new optimization model for distribution substation siting, sizing, and timing [ J ]. International Journal of Electrical Power and Energy Systems, 2008,30 (5) : 308-- 315.
5Temraz H K,Salama M M A. A planning model for siting, sizing and timing of distribution substations and defining the associated service area [J]. Electric Power Systems Research, 2002,62 (2) : 145-- 151.
6Masud E. An interactive procedure for sizing and timing distribution substations using optimization techniques [J]. IEEE Trans on Power Apparatus and Systems, 1974, 93 (5):1281--1286.
7Crowford D M ,Holt S B Jr. A mathematical optimization technique for locating and sizing distribution substations and deriving their optimal service areas [J]. IEEE Trans on Power Apparatus and Systems, 1975,92 (2) .. 230-- 235.