摘要
新建盐通铁路位于江苏省北部地区,连接盐城、南通两市,沿线地形地貌以滨海平原区、长江三角洲平原区为主,沿线公路、航运、路网、水网密布。详细介绍了在盐通铁路桥涵勘察及可研设计阶段的注意事项,并根据审查意见优化桥涵布设,为以后类似项目提供参考。
Newly-built Yancheng-Nantong Railway is located in the north of Jiangsu Province,connecting between Yancheng and Nantong.Along the line are mainly coastal plain and Yangtze River Delta plain,and along with intensive highway,shipping,road network and water network.This paper introduces in detail the precautions during the exploration and feasibility design for bridge and culvert of Yancheng-Nantong Railway.The layout of bridge and culvert is optimized ac-cording to the review opinions,which can provide a reference for future similar projects.
出处
《铁道建筑技术》
2016年第S1期8-11,共4页
Railway Construction Technology
关键词
新建铁路
桥涵
勘察设计
newly-built railway
bridge and culvert
survey and design