虽然我国高速铁路发展迅猛,各项施工技术日益成熟,但是预制箱梁支座空鼓问题却始终存在,严重制约了后续工作。结合兰新高铁疏勒河特大桥现场施工经验,对预制箱梁支座空鼓的原因进行了分析并提出相关预防处理措施,保证了桥梁的耐久性和安全性。
Although the high-speed railway develops rapidly in our country and the construction technology is increasingly mature,bearing hollowing of precast box beam always exists,which seriously restricts the follow-up work.In combination with the site construction experience of Shule River Bridge in Lanzhou-Xinjiang High-speed Railway,this paper analyzes the reasons of prefabricated box girder bearing hollowing and puts forward relevant prevention and treatment measures, which can ensure the durability and safety of the bridge.