新建车站出入口上穿既有地铁6号线变形分析与控制技术

Deformation Analysis and Control of Metro Line 6 While New Construction of the Entrance of a Metro Station on The Top of the Existing Metro Tunnel Section
下载PDF
导出
摘要 以新建车站出入口上穿既有地铁盾构区间为实例,分析了新建工程对既有地铁区间的变形影响。施工中采用深孔注浆加固措施,并采用自动化实时监测技术对既有区间进行监测,使地铁6号线区间结构变形控制在设计要求的范围内,能够确保既有地铁区间隧道结构和轨道的稳定和列车运行的安全。 This paper analyzes the deformation of the existing metro tunnel section impacted by the construction of the en-trance of a new metro station on the top of the existing metro tunnel section.With the technology of deep hole grouting to the soil and automatic real-time monitoring of the existing tunnel section,the structural deformation of the operating Metro Line 6 tunnel section is controlled to meet the requirement of design,which secures the stability of the existing subway tunnel structure and rail track,and the safety of the operation.
作者 王凯
出处 《铁道建筑技术》 2016年第S1期263-265,273,共4页 Railway Construction Technology
关键词 新建车站 上穿既有地铁 变形分析 深孔注浆 newly-built metro station over crossing existing metro deformation analysis deep hole grouting
  • 相关文献

参考文献7

二级参考文献29

共引文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部