摘要
针对深季节冻土区冻胀融沉对路基施工的影响,选取哈齐客运专线中典型断面进行现场施工监测,对变形规律进行了分析。结果表明:路基变形表现出明显的不均匀性,最大变形位置在其靠近阳面一侧而不是路基中心;路基面冻胀量很小,最大为1.63 mm,表明路基抗冻胀填料效果很好;预测最大工后沉降4.2 mm,满足我国无砟轨道高速铁路的设计要求。
In order to control the heaving and thaw effect of subgrade in deep seasonal frost region,an observation had been carried out on the typical section in Harbin-Qiqihar Passenger Dedicated Line.The trend of the deformation development is analyzed.The results showed that,a significant inhomogeneity of subgrade deformation was given,maximum deformation po-sition appeared near the sunny side rather than the center of subgrade.The amount of frost heaving was quite small,only to a maximum of 1.63 mm,indicating that the anti-frost roadbed filler worked well.The maximum post-construction settlement was forecasted to 4.2 mm,which could meet the design requirements of the ballastless track high-speed railway.
出处
《铁道建筑技术》
2016年第S1期283-286,共4页
Railway Construction Technology
基金
铁道部科技研究开发计划
关键词
深季节冻土地区
铁路路基
沉降变形
监控研究
deep seasonal frost region
railway subgrade
settlement deformation
mornitoring research