摘要
本文重点论述了施工进度控制相关内容,计算出了施工进度过程中的时间参数,对施工进度计划优化并进行控制分析,依据网络计划技术建立工作时间不确定下的进度控制模型.
this paper mainly discusses the contents related to the construction schedule control and calculate the time parameter in the process of the construction progress, to control construction progress plan optimization and analysis, on the basis of network planning technique work time to control the progress of the empirical model is established.
出处
《中国标准化》
2017年第1X期243-244,251,共3页
China Standardization
关键词
进度控制
项目成本
schedule control
The project cost