基于FLUENT的预应力孔道压浆机理与缺陷分析 被引量:2

Analysis on Mechanism and Defect of Prestressed Duct Grouting Based on FLUENT
下载PDF
导出
摘要 结合孔道压浆的流体力学机理,以常规曲线孔道和竖向孔道为基本模型,分析了压浆过程中的浆液流动充填及缺陷位置,用FLUENT软件建立了上弯曲线孔道的数值仿真计算模型,计算压浆过程中孔道内浆液的流场分布。结果表明:在曲线孔道曲率发生变化的位置,浆液的流速和压力变化较大;压浆工艺参数与孔道内浆液流体动力学特性不匹配,是导致孔道内缺陷的主要原因。 Based on the hydrodynamic mechanism of duct grouting, the slurry flow and the defect position in the grouting process were analyzed with the conventional curve duct and the vertical duct being the basic model. The numerical simulation model of the upper curve duct was established by the software FLUENT, and the flow field distribution of the slurry in the grouting process was calculated. The results show that the velocity and pressure of the slurry change greatly where the curvature of the duct varies; the parameters of grouting process do not match the hydrodynamic characteristics of the slurry, which is the main reason leading to defects in the duct.
出处 《筑路机械与施工机械化》 北大核心 2017年第5期113-116,共4页 Road Machinery & Construction Mechanization
基金 内蒙古自治区交通运输厅项目(NJ-2016-16)
关键词 预应力孔道压浆 质量缺陷 流体力学 气泡缺陷 prestressed duct grouting quality defect hydrodynamics bubble defect
  • 相关文献

参考文献5

二级参考文献25

  • 1胡新民,李世秋.斜拉桥预应力体系布置与施工质量控制[J].筑路机械与施工机械化,2004,21(10):33-36. 被引量:2
  • 2朱建强,邓敏,马惠珠,张志宾.水泥浆体早期的自收缩和干燥收缩[J].南京工业大学学报(自然科学版),2007,29(3):30-33. 被引量:19
  • 3JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 4庄军生.国外预应力混凝土工程施工指南[M].北京:中国铁道出版社,1998.
  • 5真空ポソプを并用したPCグラウト注入工法について(その2)[J].プレストレストエソクリ-ト,2004,46(3).
  • 6高チクソトロピ性PCグラウトの研究[J].プレストレストエソクリ-ト,2005,47(3).
  • 7CECS180:2005,建筑工程预应力施工规程[S].
  • 8中华人民共和国铁道部.TB/T3192--2008铁路后张法预应力混凝土梁管道压浆技术条件[S].北京:中国铁道出版社,2008.
  • 9谷坤鹏,李漠.后张预应力高性能灌浆料体积稳定性的研究[J].混凝土,2007(10):30-33. 被引量:11
  • 10薜庆.后张预应力扎道专用外加剂的研制[C].第八届后张预应力交流会论文,2004,139-142.

共引文献56

同被引文献25

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部