Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually sin...Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects.展开更多
Accurate cost estimation at the early stage of a construction project is key factor in a project’s success. But it is difficult to quickly and accurately estimate construction costs at the planning stage, when drawin...Accurate cost estimation at the early stage of a construction project is key factor in a project’s success. But it is difficult to quickly and accurately estimate construction costs at the planning stage, when drawings, documentation and the like are still incomplete. As such, various techniques have been applied to accurately estimate construction costs at an early stage, when project information is limited. While the various techniques have their pros and cons, there has been little effort made to determine the best technique in terms of cost estimating performance. The objective of this research is to compare the accuracy of three estimating techniques (regression analysis (RA), neural network (NN), and support vector machine techniques (SVM)) by performing estimations of construction costs. By comparing the accuracy of these techniques using historical cost data, it was found that NN model showed more accurate estimation results than the RA and SVM models. Consequently, it is determined that NN model is most suitable for estimating the cost of school building projects.展开更多
The rapid inflow of foreign construction workers caused the reduction of labor productivity in the construction industry due to communication problems and cultural differences. This may lead to shortage of productivit...The rapid inflow of foreign construction workers caused the reduction of labor productivity in the construction industry due to communication problems and cultural differences. This may lead to shortage of productivity and quality reduction. The cultural differences and motivation factors of foreign construction workers must be considered for effective and systematic manpower management. It is necessary to study foreign construction workers’ productivity factors that reflect cultural differences and motivation as the productivity and quality of the construction industry are subject to the work efficiency and high dependence of manpower. This study aimed to suggest effective productivity management plan considering cultural differences and motivation factors of foreign construction workers. For this purpose, the desire and motivation factors affecting on Korean workers and foreign construction workers were analyzed and the comparative analysis on the requirements by nationality was carried out. Accordingly, it is expected that this could contribute to the improvement of productivity, construction period, quality, safety and manpower management.展开更多
文摘Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects.
文摘Accurate cost estimation at the early stage of a construction project is key factor in a project’s success. But it is difficult to quickly and accurately estimate construction costs at the planning stage, when drawings, documentation and the like are still incomplete. As such, various techniques have been applied to accurately estimate construction costs at an early stage, when project information is limited. While the various techniques have their pros and cons, there has been little effort made to determine the best technique in terms of cost estimating performance. The objective of this research is to compare the accuracy of three estimating techniques (regression analysis (RA), neural network (NN), and support vector machine techniques (SVM)) by performing estimations of construction costs. By comparing the accuracy of these techniques using historical cost data, it was found that NN model showed more accurate estimation results than the RA and SVM models. Consequently, it is determined that NN model is most suitable for estimating the cost of school building projects.
文摘The rapid inflow of foreign construction workers caused the reduction of labor productivity in the construction industry due to communication problems and cultural differences. This may lead to shortage of productivity and quality reduction. The cultural differences and motivation factors of foreign construction workers must be considered for effective and systematic manpower management. It is necessary to study foreign construction workers’ productivity factors that reflect cultural differences and motivation as the productivity and quality of the construction industry are subject to the work efficiency and high dependence of manpower. This study aimed to suggest effective productivity management plan considering cultural differences and motivation factors of foreign construction workers. For this purpose, the desire and motivation factors affecting on Korean workers and foreign construction workers were analyzed and the comparative analysis on the requirements by nationality was carried out. Accordingly, it is expected that this could contribute to the improvement of productivity, construction period, quality, safety and manpower management.