应用Visual Studio 2010开发工具,结合福建省地震前兆观测台网管理的实际情况,研发一套福建省地震前兆台网运行监控日报自动编辑系统。该系统采用开放式的设计模式,可将前兆观测台网每日收集的观测日志进行自动编辑,形成符合规范的监控...应用Visual Studio 2010开发工具,结合福建省地震前兆观测台网管理的实际情况,研发一套福建省地震前兆台网运行监控日报自动编辑系统。该系统采用开放式的设计模式,可将前兆观测台网每日收集的观测日志进行自动编辑,形成符合规范的监控日报,实现人机交互的有效操作。展开更多
Using a 5-layer P- o mixed coordinates primitive equations model, a process of heavy rain is simulated that occurred over the middle-and lower-reaches of the Changjiang River on July 1- 2, 1991 and numerical experimen...Using a 5-layer P- o mixed coordinates primitive equations model, a process of heavy rain is simulated that occurred over the middle-and lower-reaches of the Changjiang River on July 1- 2, 1991 and numerical experiments are done of the effects of sea surface temperature (SST) anomalies over different waters on the precipitation. The result has shown that the appearance of SST anomaly is followed in a short term (2 or 3 days) by. A change in the pattern of circulation as well as in precipitation to some extent.展开更多
文摘Using a 5-layer P- o mixed coordinates primitive equations model, a process of heavy rain is simulated that occurred over the middle-and lower-reaches of the Changjiang River on July 1- 2, 1991 and numerical experiments are done of the effects of sea surface temperature (SST) anomalies over different waters on the precipitation. The result has shown that the appearance of SST anomaly is followed in a short term (2 or 3 days) by. A change in the pattern of circulation as well as in precipitation to some extent.