The paper proposes a new multiple-factor clustering method(NMFCM)with consideration of both box fractal dimension(BFD)and orientation of joints.This method assumes that the BFDs of different clusters were uneven,and c...The paper proposes a new multiple-factor clustering method(NMFCM)with consideration of both box fractal dimension(BFD)and orientation of joints.This method assumes that the BFDs of different clusters were uneven,and clustering was performed by redistributing the joints near the boundaries of clusters on a polar map to maximize an index for estimating the difference of the BFD(DBFD).Three main aspects were studied to develop the NMFCM.First,procedures of the NMFCM and reasonableness of assumptions were illustrated.Second,main factors affecting the NMFCM were investigated by numerical simulations with disk joint models.Finally,two different sections of a rock slope were studied to verify the practicability of the NMFCM.The results demonstrated that:(1)The NMFCM was practical and could effectively alleviate the problem of hard boundary during clustering;(2)The DBFD tended to increase after the improvement of clustering accuracy;(3)The improvement degree of the NMFCM clustering accuracy was mainly influenced by three parameters,namely,the number of clusters,number of redistributed joints,and total number of joints;and(4)The accuracy rate of clustering could be effectively improved by the NMFCM.展开更多
Due to the geological body uncertainty,the identification of the surrounding rock parameters in the tunnel construction process is of great significance to the calculation of tunnel stability.The ubiquitous-joint mode...Due to the geological body uncertainty,the identification of the surrounding rock parameters in the tunnel construction process is of great significance to the calculation of tunnel stability.The ubiquitous-joint model and three-dimensional numerical simulation have advantages in the parameter identification of surrounding rock with weak planes,but conventional methods have certain problems,such as a large number of parameters and large time consumption.To solve the problems,this study combines the orthogonal design,Gaussian process(GP)regression,and difference evolution(DE)optimization,and it constructs the parameters identification method of the jointed surrounding rock.The calculation process of parameters identification of a tunnel jointed surrounding rock based on the GP optimized by the DE includes the following steps.First,a three-dimensional numerical simulation based on the ubiquitous-joint model is conducted according to the orthogonal and uniform design parameters combing schemes,where the model input consists of jointed rock parameters and model output is the information on the surrounding rock displacement and stress.Then,the GP regress model optimized by DE is trained by the data samples.Finally,the GP model is integrated into the DE algorithm,and the absolute differences in the displacement and stress between calculated and monitored values are used as the objective function,while the parameters of the jointed surrounding rock are used as variables and identified.The proposed method is verified by the experiments with a joint rock surface in the Dadongshan tunnel,which is located in Dalian,China.The obtained calculation and analysis results are as follows:CR=0.9,F=0.6,NP=100,and the difference strategy DE/Best/1 is recommended.The results of the back analysis are compared with the field monitored values,and the relative error is 4.58%,which is satisfactory.The algorithm influencing factors are also discussed,and it is found that the local correlation coefficientσf and noise standard deviationσn affected the prediction accuracy of the GP model.The results show that the proposed method is feasible and can achieve high identification precision.The study provides an effective reference for parameter identification of jointed surrounding rock in a tunnel.展开更多
The pipe curtain structure method(PSM)is a novel construction method to control ground deformation strictly.Compared with the traditional pipe-roofing and pipe jacking method,the connection between pipes in large spac...The pipe curtain structure method(PSM)is a novel construction method to control ground deformation strictly.Compared with the traditional pipe-roofing and pipe jacking method,the connection between pipes in large spacings using PSM is widely acknowledged as a unique construction procedure.Further study on this connection procedure is needed to resolve similar cases in that the pipes are inevitably constructed on both sides of existing piles.Cutting the steel plate during the connection procedure is the first step,which is crucial to control the safety and stability of the surrounding environment and existing structures.The deformation mechanism and limit support pressure of the cutting steel plate during the connection between pipes in large spacings are studied in this paper,relying on the undercrossing Yifeng gate tower project of Jianning West Road River Crossing Channel in Nanjing,China.A modified 3D wedge-prism failure model is proposed using the 3D discrete element method.Combined with Terzaghi loose earth pressure theory and the limit equilibrium theory,the analytical solutions for the limit support pressure of the excavation face of the cutting steel plate are derived.The modified 3D wedge-prism failure model and corresponding analytical solutions are categorised into two cases:(a)unilateral cutting scheme,and(b)bilateral cutting scheme.The analytical solutions for the two cases are verified from the numerical simulation and in-situ data and compared with the previous solutions.The comparative analysis between the unilateral and bilateral cutting schemes indicates that the bilateral cutting scheme can be adopted as a priority.The bilateral cutting scheme saves more time and induces less ground deformation than the unilateral one due to the resistance generated from the superimposed wedge.In addition,the parametric sensitivity analysis is carried out using an orthogonal experimental design.The main influencing factors arranged from high to low are the pipe spacing,the cutting size,and the pipe burial depth.The ground deformation increases with the increased cutting size and pipe spacing.The pipe burial depth slightly affects the ground deformation if the other two factors are minor.Cutting steel plates in small sizes,excavating soil under low disturbance,and supporting pipes for high frequency can effectively reduce the ground surface subsidence.展开更多
An analytical model is proposed to estimate the discontinuous mechanical behavior of an existing shield tunnel above a new tunnel. The existing shield tunnel is regarded as a Timoshenko beam with longitudinal joints. ...An analytical model is proposed to estimate the discontinuous mechanical behavior of an existing shield tunnel above a new tunnel. The existing shield tunnel is regarded as a Timoshenko beam with longitudinal joints. The opening and relative dislocation of the longitudinal joints can be calculated using Dirac delta functions. Compared with other approaches, our method yields results that are consistent with centrifugation test data. The effects of the stiffness reduction at the longitudinal joints (α and β), the shearing stiffness of the Timoshenko beam GA, and different additional pressure profiles on the responses of the shield tunnel are investigated. The results indicate that our proposed method is suitable for simulating the discontinuous mechanical behaviors of existing shield tunnels with longitudinal joints. The deformation and internal forces decrease as α, β, and GA increase. The bending moment and shear force are discontinuous despite slight discontinuities in the deflection, opening, and dislocation. The deflection curve is consistent with the additional pressure profile. Extensive opening, dislocation, and internal forces are induced at the location of mutation pressures. In addition, the joints allow rigid structures to behave flexibly in general, as well as allow flexible structures to exhibit locally rigid characteristics. Owing to the discontinuous characteristics, the internal forces and their abrupt changes at vulnerable sections must be monitored to ensure the structural safety of existing shield tunnels.展开更多
基金funded by the National Natural Science Foundation of China(Grant Nos.41972264 and 52078093)Liaoning Revitalization Talents Program,China(Grant No.XLYC1905015)。
文摘The paper proposes a new multiple-factor clustering method(NMFCM)with consideration of both box fractal dimension(BFD)and orientation of joints.This method assumes that the BFDs of different clusters were uneven,and clustering was performed by redistributing the joints near the boundaries of clusters on a polar map to maximize an index for estimating the difference of the BFD(DBFD).Three main aspects were studied to develop the NMFCM.First,procedures of the NMFCM and reasonableness of assumptions were illustrated.Second,main factors affecting the NMFCM were investigated by numerical simulations with disk joint models.Finally,two different sections of a rock slope were studied to verify the practicability of the NMFCM.The results demonstrated that:(1)The NMFCM was practical and could effectively alleviate the problem of hard boundary during clustering;(2)The DBFD tended to increase after the improvement of clustering accuracy;(3)The improvement degree of the NMFCM clustering accuracy was mainly influenced by three parameters,namely,the number of clusters,number of redistributed joints,and total number of joints;and(4)The accuracy rate of clustering could be effectively improved by the NMFCM.
基金This work was supported by the National Natural Science Foundation of China(Nos.51678101,52078093)Liaoning Revitalization Talents Program(No.XLYC1905015).
文摘Due to the geological body uncertainty,the identification of the surrounding rock parameters in the tunnel construction process is of great significance to the calculation of tunnel stability.The ubiquitous-joint model and three-dimensional numerical simulation have advantages in the parameter identification of surrounding rock with weak planes,but conventional methods have certain problems,such as a large number of parameters and large time consumption.To solve the problems,this study combines the orthogonal design,Gaussian process(GP)regression,and difference evolution(DE)optimization,and it constructs the parameters identification method of the jointed surrounding rock.The calculation process of parameters identification of a tunnel jointed surrounding rock based on the GP optimized by the DE includes the following steps.First,a three-dimensional numerical simulation based on the ubiquitous-joint model is conducted according to the orthogonal and uniform design parameters combing schemes,where the model input consists of jointed rock parameters and model output is the information on the surrounding rock displacement and stress.Then,the GP regress model optimized by DE is trained by the data samples.Finally,the GP model is integrated into the DE algorithm,and the absolute differences in the displacement and stress between calculated and monitored values are used as the objective function,while the parameters of the jointed surrounding rock are used as variables and identified.The proposed method is verified by the experiments with a joint rock surface in the Dadongshan tunnel,which is located in Dalian,China.The obtained calculation and analysis results are as follows:CR=0.9,F=0.6,NP=100,and the difference strategy DE/Best/1 is recommended.The results of the back analysis are compared with the field monitored values,and the relative error is 4.58%,which is satisfactory.The algorithm influencing factors are also discussed,and it is found that the local correlation coefficientσf and noise standard deviationσn affected the prediction accuracy of the GP model.The results show that the proposed method is feasible and can achieve high identification precision.The study provides an effective reference for parameter identification of jointed surrounding rock in a tunnel.
基金financial support by the National Natural Science Foundation of China(Grant No.52108363)the Postdoctoral Research Foundation of China(Grant Nos.2021M700654 and 2023T160074)+2 种基金the Key Project of High-speed Rail Joint Fund of National Natural Science Foundation of China(Grant No.U1934210)the Liaoning Revitalization Talents Program(Grant No.XLYC1905015)the Key Project of Liaoning Education Department,China(Grant No.LJKZZ20220003).
文摘The pipe curtain structure method(PSM)is a novel construction method to control ground deformation strictly.Compared with the traditional pipe-roofing and pipe jacking method,the connection between pipes in large spacings using PSM is widely acknowledged as a unique construction procedure.Further study on this connection procedure is needed to resolve similar cases in that the pipes are inevitably constructed on both sides of existing piles.Cutting the steel plate during the connection procedure is the first step,which is crucial to control the safety and stability of the surrounding environment and existing structures.The deformation mechanism and limit support pressure of the cutting steel plate during the connection between pipes in large spacings are studied in this paper,relying on the undercrossing Yifeng gate tower project of Jianning West Road River Crossing Channel in Nanjing,China.A modified 3D wedge-prism failure model is proposed using the 3D discrete element method.Combined with Terzaghi loose earth pressure theory and the limit equilibrium theory,the analytical solutions for the limit support pressure of the excavation face of the cutting steel plate are derived.The modified 3D wedge-prism failure model and corresponding analytical solutions are categorised into two cases:(a)unilateral cutting scheme,and(b)bilateral cutting scheme.The analytical solutions for the two cases are verified from the numerical simulation and in-situ data and compared with the previous solutions.The comparative analysis between the unilateral and bilateral cutting schemes indicates that the bilateral cutting scheme can be adopted as a priority.The bilateral cutting scheme saves more time and induces less ground deformation than the unilateral one due to the resistance generated from the superimposed wedge.In addition,the parametric sensitivity analysis is carried out using an orthogonal experimental design.The main influencing factors arranged from high to low are the pipe spacing,the cutting size,and the pipe burial depth.The ground deformation increases with the increased cutting size and pipe spacing.The pipe burial depth slightly affects the ground deformation if the other two factors are minor.Cutting steel plates in small sizes,excavating soil under low disturbance,and supporting pipes for high frequency can effectively reduce the ground surface subsidence.
基金supported by the National Natural Science Foundation of China(Grant No.52108363)Postdoctoral Science Foundation of China(No.2021M700654)+2 种基金Fundamental Research Funds for the Central Universities(No.3132022175)Key Laboratory of Urban Underground Engineering of Ministry of Education,Beijing Jiaotong University(No.TUL2022-01)Liaoning Revitalization Talents Program(No.XLYC1905015).
文摘An analytical model is proposed to estimate the discontinuous mechanical behavior of an existing shield tunnel above a new tunnel. The existing shield tunnel is regarded as a Timoshenko beam with longitudinal joints. The opening and relative dislocation of the longitudinal joints can be calculated using Dirac delta functions. Compared with other approaches, our method yields results that are consistent with centrifugation test data. The effects of the stiffness reduction at the longitudinal joints (α and β), the shearing stiffness of the Timoshenko beam GA, and different additional pressure profiles on the responses of the shield tunnel are investigated. The results indicate that our proposed method is suitable for simulating the discontinuous mechanical behaviors of existing shield tunnels with longitudinal joints. The deformation and internal forces decrease as α, β, and GA increase. The bending moment and shear force are discontinuous despite slight discontinuities in the deflection, opening, and dislocation. The deflection curve is consistent with the additional pressure profile. Extensive opening, dislocation, and internal forces are induced at the location of mutation pressures. In addition, the joints allow rigid structures to behave flexibly in general, as well as allow flexible structures to exhibit locally rigid characteristics. Owing to the discontinuous characteristics, the internal forces and their abrupt changes at vulnerable sections must be monitored to ensure the structural safety of existing shield tunnels.