期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Improvement of the Life Cycle Costing Method in DesignStage Using KBIMS Library
1
作者 chun-kyong lee 《Journal of Civil Engineering and Architecture》 2019年第12期780-792,共13页
With the advent of the fourth industrial revolution,the construction industry has undergone a paradigm shift.The smart construction technology market is expected to grow 12%annually in developed countries due to advan... With the advent of the fourth industrial revolution,the construction industry has undergone a paradigm shift.The smart construction technology market is expected to grow 12%annually in developed countries due to advanced technology investments.It is expected that businesses requiring highly sophisticated technology,for instance companies that need their old facilities upgraded,will become the main focus of the market.As building information modeling(BIM)design is becoming mandatory,such as in the Korea Public Procurement Service,researches regarding building automation,construction,and operation integration management systems based on BIM are conducted.In addition,for construction projects of over 10 billion won,design value engineering(Design VE)implementation,including life cycle cost(LCC)analysis,is mandatory at the design stage to improve quality and reduce the lifetime costs of buildings.In this study,we propose an improvement plan for LCC analysis at the design stage using the KBIMS library,which is an open BIM library developed by the Korean government and research groups.We analyze the existing LCC method,KBIMS library,and attribute information,and model the process that is applied in the LCC analysis system.This is expected to complement the LCC analysis system and improve work productivity. 展开更多
关键词 Life cycle costing building information modeling design value engineering automation design automation analysis.
下载PDF
Development of Building Maintenance System for Monitoring Repair and Replacement Histories of Public Facilities
2
作者 chun-kyong lee Tae-Keun Park 《Journal of Civil Engineering and Architecture》 2012年第11期1464-1472,共9页
The Korea Water Resources Corporation (K-Water) has encountered four problems during the management of water resources of approximately 1,300 buildings spread throughout the country-degradation, budget constraints, ... The Korea Water Resources Corporation (K-Water) has encountered four problems during the management of water resources of approximately 1,300 buildings spread throughout the country-degradation, budget constraints, lack of standards, and lack of planning. In this study, we have developed a mechanism for collecting, maintaining, and analyzing ground data for repair and replacement works. Our BMS (building maintenance system) uses the recorded repair and replacement work histories and calculates the life cycle costs of the related items. Further, it enables the performance of repair and replacement tasks through an integrated approach aimed at preventive maintenance. In this manner, the BMS is expected to maximize the efficiency of the formulation of prevention and maintenance work plans, monitoring of work histories, predictions of future tasks from the analyses of repair and replacement histories, and performance of LCC (life cycle cost) calculations. Reliable maintenance of national properties can thus be achieved by using the BMS, which promotes reasonable and efficient repair and replacement activities. 展开更多
关键词 Maintenance system priority determination repair and replacement public facilities
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部