To solve the problem of small amount of machining centers in small and medium flexible manufacture systems(FMS), a scheduling mode of single automated guided vehicle(AGV) is adopted to deal with multiple transport req...To solve the problem of small amount of machining centers in small and medium flexible manufacture systems(FMS), a scheduling mode of single automated guided vehicle(AGV) is adopted to deal with multiple transport requests in this paper. Firstly, a workshop scheduling mechanism of AGV is analyzed and a mathematical model is established using Genetic Algorithm. According to several sets of transport priority of AGV, processes of FMS are encoded, and fitness function, selection, crossover, and variation methods are designed. The transport priority which has the least impact on scheduling results is determined based on the simulation analysis of Genetic Algorithm, and the makespan, the longest waiting time, and optimal route of the car are calculated. According to the actual processing situation of the workshop, feasibility of this method is verified successfully to provide an effective solution to the scheduling problem of single AGV.展开更多
基金Supported by the National Natural Science Foundation of China(No.51765043)
文摘To solve the problem of small amount of machining centers in small and medium flexible manufacture systems(FMS), a scheduling mode of single automated guided vehicle(AGV) is adopted to deal with multiple transport requests in this paper. Firstly, a workshop scheduling mechanism of AGV is analyzed and a mathematical model is established using Genetic Algorithm. According to several sets of transport priority of AGV, processes of FMS are encoded, and fitness function, selection, crossover, and variation methods are designed. The transport priority which has the least impact on scheduling results is determined based on the simulation analysis of Genetic Algorithm, and the makespan, the longest waiting time, and optimal route of the car are calculated. According to the actual processing situation of the workshop, feasibility of this method is verified successfully to provide an effective solution to the scheduling problem of single AGV.