Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for...Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for China’s first URL,named Beishan URL.For this,a preliminary design of the Beishan URL has been proposed,including one spiral ramp,three shafts and two experimental levels.With advantages of fast advancing and limited disturbance to surrounding rock mass,the tunnel boring machine(TBM)method could be one of the excavation methods considered for the URL ramp.This paper introduces the feasibility study on using TBM to excavation of the Beishan URL ramp.The technical challenges for using TBM in Beishan URL are identified on the base of geological condition and specific layout of the spiral ramp.Then,the technical feasibility study on the specific issues,i.e.extremely hard rock mass,high abrasiveness,TBM operation,muck transportation,water drainage and material transportation,is investigated.This study demonstrates that TBM technology is a feasible method for the Beishan URL excavation.The results can also provide a reference for the design and construction of HLW disposal engineering in similar geological conditions.2020 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http://creativecommons.org/licenses/by-nc-nd/4.0/).展开更多
1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Labora...1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Laboratory(URL)initiative in China.Beishan URL,the first URL for geological disposal of high level radioactive waste(HLW)in China,is a national key construction project listed in the“13th Five-Year Plan”.In 2019,subsequent to receiving approval from the China Atomic Energy Authority,the Beijing Research Institute of Uranium Geology(BRIUG),serving as the project’s owner,initiated its construction.This underground facility,categorized as a“third generation”URL for HLW disposal,i.e.,area-specific URL,was located in Beishan,Jiuquan City,Gansu Province,China,following more than three decades of rigorous research on site selection.展开更多
The mechanical behavior of host rock for a deep geological repository of high-level radioactive waste plays a key role in ensuring the isolation function of host rock as a natural barrier under the multi-field couplin...The mechanical behavior of host rock for a deep geological repository of high-level radioactive waste plays a key role in ensuring the isolation function of host rock as a natural barrier under the multi-field coupling environment.For a better understanding of granite in China's Beishan pre-selected area for geological disposal of high-level radioactive waste,a series of investigations were carried out on in-situ stress field of rock mass at depth,strength and deformation characteristics of rocks under different stress and temperature conditions,and rock boreability and adaptability to Tunnel Boring Machine(TBM)technology.The results indicate that Beishan granite shows typical characteristics as a hard and brittle rock with a quite low permeability,and it is favorable to geological disposal.Meanwhile,a new rock mass suitability evaluation system was proposed,and the rock mass mainly composed of Beishan granite was proven to be suitable for geological disposal.Besides,the constructability of Beishan granite at engineering scale was tested and verified through field tests in the Beishan Exploration Tunnel(BET).Here,we summarize the main outcomes of rock mechanics research on Beishan granite in the past years and introduced the current progress of Beishan underground research laboratory(URL)for geological disposal.展开更多
基金China Atomic Energy Authority is thanked for its financial support for this project.The authors would like to acknowledge China Railway Engineering Equipment Group Co.,Ltd.,China Railway Construction Heavy Industry Co.,Ltd.,Herrenknecht AG,China Railway 18th Bureau Group Co.,Ltd.,China Railway Tunnel Group Co.,Ltd.,and Liaoning Censcience Industry Co.,Ltd.for their technical support on this research.The valuable comments by two reviewers are appreciated as well.
文摘Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for China’s first URL,named Beishan URL.For this,a preliminary design of the Beishan URL has been proposed,including one spiral ramp,three shafts and two experimental levels.With advantages of fast advancing and limited disturbance to surrounding rock mass,the tunnel boring machine(TBM)method could be one of the excavation methods considered for the URL ramp.This paper introduces the feasibility study on using TBM to excavation of the Beishan URL ramp.The technical challenges for using TBM in Beishan URL are identified on the base of geological condition and specific layout of the spiral ramp.Then,the technical feasibility study on the specific issues,i.e.extremely hard rock mass,high abrasiveness,TBM operation,muck transportation,water drainage and material transportation,is investigated.This study demonstrates that TBM technology is a feasible method for the Beishan URL excavation.The results can also provide a reference for the design and construction of HLW disposal engineering in similar geological conditions.2020 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http://creativecommons.org/licenses/by-nc-nd/4.0/).
文摘1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Laboratory(URL)initiative in China.Beishan URL,the first URL for geological disposal of high level radioactive waste(HLW)in China,is a national key construction project listed in the“13th Five-Year Plan”.In 2019,subsequent to receiving approval from the China Atomic Energy Authority,the Beijing Research Institute of Uranium Geology(BRIUG),serving as the project’s owner,initiated its construction.This underground facility,categorized as a“third generation”URL for HLW disposal,i.e.,area-specific URL,was located in Beishan,Jiuquan City,Gansu Province,China,following more than three decades of rigorous research on site selection.
基金supported by the China Atomic Energy Authority(CAEA)through the Geological Disposal Program and the National Natural Science Foundation of China(Grant No.11972149).
文摘The mechanical behavior of host rock for a deep geological repository of high-level radioactive waste plays a key role in ensuring the isolation function of host rock as a natural barrier under the multi-field coupling environment.For a better understanding of granite in China's Beishan pre-selected area for geological disposal of high-level radioactive waste,a series of investigations were carried out on in-situ stress field of rock mass at depth,strength and deformation characteristics of rocks under different stress and temperature conditions,and rock boreability and adaptability to Tunnel Boring Machine(TBM)technology.The results indicate that Beishan granite shows typical characteristics as a hard and brittle rock with a quite low permeability,and it is favorable to geological disposal.Meanwhile,a new rock mass suitability evaluation system was proposed,and the rock mass mainly composed of Beishan granite was proven to be suitable for geological disposal.Besides,the constructability of Beishan granite at engineering scale was tested and verified through field tests in the Beishan Exploration Tunnel(BET).Here,we summarize the main outcomes of rock mechanics research on Beishan granite in the past years and introduced the current progress of Beishan underground research laboratory(URL)for geological disposal.