Gas disasters always restrict the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. China is rich in coal resources and has a large amo...Gas disasters always restrict the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. China is rich in coal resources and has a large amount of gas with a wide range of distribution. However, China experienced not only adverse effects on coal mining but also gas disasters in underground engineering construction, such as tunnels and chambers. With the increased number of tunnels passing through coal-bearing strata, the incidence of gas accidents is also rising. Therefore, the significance of preventing and mitigating gas disasters should be emphasized, and an effective risk assessment method for gas disasters should be established. On the basis of research on over 100 gas tunnels in China, a relatively ideal gas disaster risk assessment method and system for tunnels are established through the following measures. Firstly, geo-environmental conditions and gas situations were analyzed during construction. Secondly, qualitative analysis was combined with quantitative analysis. Finally, the influencing factors of gas disasters, including geological conditions, gas,and human factors, were investigated. The gas tunnel risk assessment system includes three levels:(1) the grading assessment of a gas tunnel during the planning stage,(2) the risk assessment of gas tunnel construction during the design and construction stages,(3) the gas tunnel outburst risk assessment during the coal uncovering stage. This system was applied to the dynamic assessment of gas disaster during the construction of the Zipingpu tunnel of Dujiangyan–Wenchuan Highway(in Sichuan, Southwest China). The assessment results were consistent with the actual excavation, which verified the rationality and feasibility of the system. The developed system was believed to be back-up and applied for risk assessment of gas disaster in the underground engineering construction.展开更多
At present, most calculation results regarding foundation pit dewatering are ideal values, making construction resources prone to being wasted. In order to optimize the traditional pipe well design of large wells, the...At present, most calculation results regarding foundation pit dewatering are ideal values, making construction resources prone to being wasted. In order to optimize the traditional pipe well design of large wells, the linear programming solution module in Excel is used, with the total water inflow taken as the objective function, the water level drawdown used as the constraint and test condition, and a station project on the Chengdu Metro Line 7 serving as the subject of this study. The total water inflow of the traditional pipe well design is optimized by the simplex method, producing a total water inflow of 4 040.65 m^3/d, which, compared with 4 829.79 m^3/d, the total water inflow calculated by means of the traditional design optimization method, engenders a reduction of roughly 16% per day. The feasibility of the optimization methodology is verified by the drawdown constraint, which reveals the decrease of construction costs and the diminution of the influence that the lowered groundwater level has on the surroundings of the metro station. Finally, references are provided as to optimizing the dewatering designs for other metro stations in similar engineering and hydrogeological conditions.展开更多
Engineering-hydrogeological problems arise from the interaction between engineering activities and geological environment, in which rock-soil mass and groundwater are especially important constituents. However, up-to-...Engineering-hydrogeological problems arise from the interaction between engineering activities and geological environment, in which rock-soil mass and groundwater are especially important constituents. However, up-to-date research on them is relatively dispersive and simple due to their complexity and lack of comprehensive and systematic study methods. Starting from geological analysis of mechanism to geological model based on geological regularities, the paper predicts the tendency of geological evolvement and puts forward proper measures to solve problems. In this paper, elevated water-sensitive structure in rock-soil mass, which mainly causes engineering hydrogeological problems, and problems in hydropower is discussed based on unique construction in Chinese Western hydropower projects. Engineering hydrogeological problems are reservoir induced earthquakes leakage from reservoir bottom in karst, stability of high slope at reservoir banks, sliding of dam foundation and dam abutment, and confined water at key positions which are introduced and determined by using water-sensitive factors(or structure) according to special hydrogeological conditions.展开更多
基金support by the National Natural Science Foundation of China (Grant No. 41302244)
文摘Gas disasters always restrict the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. China is rich in coal resources and has a large amount of gas with a wide range of distribution. However, China experienced not only adverse effects on coal mining but also gas disasters in underground engineering construction, such as tunnels and chambers. With the increased number of tunnels passing through coal-bearing strata, the incidence of gas accidents is also rising. Therefore, the significance of preventing and mitigating gas disasters should be emphasized, and an effective risk assessment method for gas disasters should be established. On the basis of research on over 100 gas tunnels in China, a relatively ideal gas disaster risk assessment method and system for tunnels are established through the following measures. Firstly, geo-environmental conditions and gas situations were analyzed during construction. Secondly, qualitative analysis was combined with quantitative analysis. Finally, the influencing factors of gas disasters, including geological conditions, gas,and human factors, were investigated. The gas tunnel risk assessment system includes three levels:(1) the grading assessment of a gas tunnel during the planning stage,(2) the risk assessment of gas tunnel construction during the design and construction stages,(3) the gas tunnel outburst risk assessment during the coal uncovering stage. This system was applied to the dynamic assessment of gas disaster during the construction of the Zipingpu tunnel of Dujiangyan–Wenchuan Highway(in Sichuan, Southwest China). The assessment results were consistent with the actual excavation, which verified the rationality and feasibility of the system. The developed system was believed to be back-up and applied for risk assessment of gas disaster in the underground engineering construction.
基金supported by State Key Laboratory of Geohazard Prevention and Geoenvironment Protection Independent Research Project (SKLGP2018Z018)
文摘At present, most calculation results regarding foundation pit dewatering are ideal values, making construction resources prone to being wasted. In order to optimize the traditional pipe well design of large wells, the linear programming solution module in Excel is used, with the total water inflow taken as the objective function, the water level drawdown used as the constraint and test condition, and a station project on the Chengdu Metro Line 7 serving as the subject of this study. The total water inflow of the traditional pipe well design is optimized by the simplex method, producing a total water inflow of 4 040.65 m^3/d, which, compared with 4 829.79 m^3/d, the total water inflow calculated by means of the traditional design optimization method, engenders a reduction of roughly 16% per day. The feasibility of the optimization methodology is verified by the drawdown constraint, which reveals the decrease of construction costs and the diminution of the influence that the lowered groundwater level has on the surroundings of the metro station. Finally, references are provided as to optimizing the dewatering designs for other metro stations in similar engineering and hydrogeological conditions.
文摘Engineering-hydrogeological problems arise from the interaction between engineering activities and geological environment, in which rock-soil mass and groundwater are especially important constituents. However, up-to-date research on them is relatively dispersive and simple due to their complexity and lack of comprehensive and systematic study methods. Starting from geological analysis of mechanism to geological model based on geological regularities, the paper predicts the tendency of geological evolvement and puts forward proper measures to solve problems. In this paper, elevated water-sensitive structure in rock-soil mass, which mainly causes engineering hydrogeological problems, and problems in hydropower is discussed based on unique construction in Chinese Western hydropower projects. Engineering hydrogeological problems are reservoir induced earthquakes leakage from reservoir bottom in karst, stability of high slope at reservoir banks, sliding of dam foundation and dam abutment, and confined water at key positions which are introduced and determined by using water-sensitive factors(or structure) according to special hydrogeological conditions.