To analyze the stress wave propagation associated with the vortex-induced vibration(VIV) of a marine riser, this paper employed a multi-signal complex exponential method. This method is an extension of the classical...To analyze the stress wave propagation associated with the vortex-induced vibration(VIV) of a marine riser, this paper employed a multi-signal complex exponential method. This method is an extension of the classical Prony's method which decomposes a complicated signal into a number of complex exponential components. Because the proposed method processes multiple signals simultaneously, it can estimate the “global” dominating frequencies(poles) shared by those signals.The complex amplitude(residues) corresponding to the estimated frequencies for those signals is also obtained in the process. As the signals were collected at different locations along the axial direction of a marine riser, the phenomena of the stress wave propagation could be analyzed through the obtained residues of those signals. The Norwegian Deepwater Program(NDP) high mode test data were utilized in the numerical studies, including data sets in both the in-line(IL) and cross-flow(CF) directions. It was found that the most dominant component in the IL direction has its stress wave propagation along the riser being dominated by a standing wave, while that in the CF direction dominated by a traveling wave.展开更多
To control land surface subsidence caused the underground mineral exploitation and the catastrophic phenomena such as serious damage of buildings, waterbodies, cultivated lands, railways, bridges caused by land subsid...To control land surface subsidence caused the underground mineral exploitation and the catastrophic phenomena such as serious damage of buildings, waterbodies, cultivated lands, railways, bridges caused by land subsidence, bed separation grouting technology of overburden is put forward. To provide theoretical support for the technology, the characteristics and the mechanics mechanism of mining overburden from layer-split to formation of bed separation are studied. On the basis of elastic sheet board theory, calculation formula of rock sheet deflection is presented, and the mechanics criteria of the separation formation and the calculation formula of bed separation volume are set up. Finally, the applications and technics of bed separation grout technology of mining overburden to control land subsidence in china are introduced.展开更多
基金financially supported by the National Natural Science Foundation of China(Grant Nos.51490675,51379197 and 51522906)
文摘To analyze the stress wave propagation associated with the vortex-induced vibration(VIV) of a marine riser, this paper employed a multi-signal complex exponential method. This method is an extension of the classical Prony's method which decomposes a complicated signal into a number of complex exponential components. Because the proposed method processes multiple signals simultaneously, it can estimate the “global” dominating frequencies(poles) shared by those signals.The complex amplitude(residues) corresponding to the estimated frequencies for those signals is also obtained in the process. As the signals were collected at different locations along the axial direction of a marine riser, the phenomena of the stress wave propagation could be analyzed through the obtained residues of those signals. The Norwegian Deepwater Program(NDP) high mode test data were utilized in the numerical studies, including data sets in both the in-line(IL) and cross-flow(CF) directions. It was found that the most dominant component in the IL direction has its stress wave propagation along the riser being dominated by a standing wave, while that in the CF direction dominated by a traveling wave.
基金Foundation item:Key Project of Natural Seien6e Foundation of China(No:50434020 and NO:50274044)Key Project of Science Foundation of Shandong Province(No:Z20031:02)
文摘To control land surface subsidence caused the underground mineral exploitation and the catastrophic phenomena such as serious damage of buildings, waterbodies, cultivated lands, railways, bridges caused by land subsidence, bed separation grouting technology of overburden is put forward. To provide theoretical support for the technology, the characteristics and the mechanics mechanism of mining overburden from layer-split to formation of bed separation are studied. On the basis of elastic sheet board theory, calculation formula of rock sheet deflection is presented, and the mechanics criteria of the separation formation and the calculation formula of bed separation volume are set up. Finally, the applications and technics of bed separation grout technology of mining overburden to control land subsidence in china are introduced.