期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Design and high-power testing of offline conditioning cavity for CiADS RFQ high-power coupler
1
作者 Ruo-Xu Wang Yuan He +6 位作者 long-bo shi Chen-Xing Li Zong-Heng Xue Tian-Cai Jiang Xian-Bo Xu Lie-Peng Sun Zhou-Li Zhang 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2024年第9期18-27,共10页
To validate the design rationality of the power coupler for the RFQ cavity and minimize cavity contamination,we designed a low-loss offline conditioning cavity and conducted high-power testing.This offline cavity feat... To validate the design rationality of the power coupler for the RFQ cavity and minimize cavity contamination,we designed a low-loss offline conditioning cavity and conducted high-power testing.This offline cavity features two coupling ports and two tuners,operating at a frequency of 162.5 MHz with a tuning range of 3.2 MHz.Adjusting the installation angle of the coupling ring and the insertion depth of the tuner helps minimize cavity losses.We performed electromagnetic structural and multiphysics simulations,revealing a minimal theoretical power loss of 4.3%.However,when the cavity frequency varied by110 kHz,theoretical power losses increased to10%,necessitating constant tuner adjustments during conditioning.Multiphysics simulations indicated that increased cavity temperature did not affect frequency variation.Upon completion of the offline high-power conditioning platform,we measured the transmission performance,revealing a power loss of 6.3%,exceeding the theoretical calculation.Conditioning utilized efficient automatic range scanning and standing wave resonant methods.To fully condition the power coupler,a 15°phase difference between two standing wave points in the condition-ing system was necessary.Notably,the maximum continuous wave power surpassed 20 kW,exceeding the expected target. 展开更多
关键词 RFQ cavity Power coupler Offline conditioning Resonant cavity
下载PDF
Measurement of the cavity-loaded quality factor in superconducting radio-frequency systems with mismatched source impedance
2
作者 Jin-Ying Ma Cheng-Ye Xu +12 位作者 An-Dong Wu Guo-Dong Jiang Yue Tao Zong-Heng Xue long-bo shi Tian-Cai Jiang Zheng-Long Zhu Zi-Qin Yang Zheng Gao Lie-Peng Sun Gui-Rong Huang Feng Qiu Yuan He 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2023年第8期12-23,共12页
The accurate measurement of parameters such as the cavity-loaded quality factor(Q_(L))and half bandwidth(f_(0.5))is essential for monitoring the performance of superconducting radio-frequency cavities.However,the conv... The accurate measurement of parameters such as the cavity-loaded quality factor(Q_(L))and half bandwidth(f_(0.5))is essential for monitoring the performance of superconducting radio-frequency cavities.However,the conventional"field decay method"employed to calibrate these values requires the cavity to satisfy a"zero-input"condition.This can be challenging when the source impedance is mismatched and produce nonzero forward signals(V_(f))that significantly affect the measurement accuracy.To address this limitation,we developed a modified version of the"field decay method"based on the cavity differential equation.The proposed approach enables the precise calibration of f_(0.5) even under mismatch conditions.We tested the proposed approach on the SRF cavities of the Chinese Accelerator-Driven System Front-End Demo Superconducting Linac and compared the results with those obtained from a network analyzer.The two sets of results were consistent,indicating the usefulness of the proposed approach. 展开更多
关键词 Loaded quality factor Field decay method Superconducting cavity MISMATCH Calibration Cavity differential equation Measurement Accelerator-driven system
下载PDF
New thermal optimization scheme of power module in solid-state amplifier 被引量:3
3
作者 Lie-Peng Sun Zhen-Yu Yuan +5 位作者 Cheng Zhang Xian-Bo Xu Jun-Gang Miao Jian-Hua Zhang long-bo shi Yuan He 《Nuclear Science and Techniques》 SCIE CAS CSCD 2019年第4期143-149,共7页
The new 1 kW power module for ADS project needs the optimization of cooling design including water flow and tunnel layout, and the water flow of three tons per hour was chosen to be a goal for a 20 kW power source.Acc... The new 1 kW power module for ADS project needs the optimization of cooling design including water flow and tunnel layout, and the water flow of three tons per hour was chosen to be a goal for a 20 kW power source.According to analysis from the insertion and integrated loss, about 24 modules were integrated into the rated power. Thus, every module has a cooling flow of 2.1 L/min for RF heat load and power supply loss, which is very hard to achieve if no special consideration and techniques. A new thermal simulation method was introduced for thermal analysis of cooling plate through CST multi-physics suite,especially for temperature of power LDMOS transistor.Some specific measures carried out for the higher heat transfer were also presented in this paper. 展开更多
关键词 RF system SOLID-STATE AMPLIFIER Power MODULE HEAT TRANSFER COEFFICIENT
下载PDF
Precise calibration of cavity forward and reflected signals using low-level radio-frequency system 被引量:1
4
作者 Jin-Ying Ma Feng Qiu +11 位作者 long-bo shi Zheng-Long Zhu Tian-Cai Jiang Zong-Heng Xue Ke-An Jin Qi Chen Cheng-Ye Xu Xing-Hao Ding Zheng Gao Lie-Peng Sun Gui-Rong Huang Yuan He 《Nuclear Science and Techniques》 SCIE EI CAS CSCD 2022年第1期35-43,共9页
Precise measurements of the cavity forward(Vf)and reflected signals(Vr)are essential for characterizing other key parameters such as the cavity detuning and forward power.In practice,it is challenging to measure V_(f)... Precise measurements of the cavity forward(Vf)and reflected signals(Vr)are essential for characterizing other key parameters such as the cavity detuning and forward power.In practice,it is challenging to measure V_(f) and V_(r) precisely because of cross talk between the forward and reflected channels(e.g.,coupling between the cavity reflected and forward signals in a directional coupler with limited directivity).For DESY,a method based on the cavity differential equation was proposed to precisely calibrate the actual V_(f) and V_(r).In this study,we verified the validity and practicability of this approach for the Chinese ADS front-end demo superconducting linac(CAFe)facility at the Institute of Modern Physics and a compact energy recovery linac(cERL)test machine at KEK.At the CAFe facility,we successfully calibrated the actual V_(f) signal using this method.The result demonstrated that the directivity of directional couplers might seriously affect the accuracy of V_(f) measurement.At the cERL facility,we calibrated the Lorentz force detuning(LFD)using the actual Vf.Our study confirmed that the precise calibration of V_(f) significantly improves the accuracy of the cavity LFD measurement. 展开更多
关键词 Forward and reflected signals MEASUREMENT CALIBRATION
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部