PROJECT REGULARITY: DEVELOPMENT AND EVALUATION OF A NEW PROJECT CHARACTERISTIC 被引量:2
1
作者 Jordy Batselier mario vanhoucke 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2017年第1期100-120,共21页
The ability to accurately characterize projects novel project characteristic is developed characteristic, called project regularity, is essential to good project management. Therefore, a reflects the value accrue with... The ability to accurately characterize projects novel project characteristic is developed characteristic, called project regularity, is essential to good project management. Therefore, a reflects the value accrue within a project. This expressed in terms of the newly introduced regular/irregular-indicator RI. The widely accepted management system of earned value management (EVM) forms the basis for evaluation of the new characteristic. More concretely, the influence of project regularity on EVMforecasting accuracy is assessed, and is shown to be significant for both time and cost forecasting. Moreover, this effect appears to be stronger than that of the widely used characteristic of project seriality expressed by the serial/parallel-indicator SP. Therefore, project regularity could also be useful as an input parameter for project network generators. Furthermore, the introduction of project regularity can provide project managers with a more accurate indication of the time and cost forecasting accuracy that is to be expected for a certain project and, correspondingly, of how a project should be built up in order to obtain more reliable forecasts during project control. 展开更多
关键词 Project management earned value management time and cost forecasting empirical database Monte Carlo simulation project control system
原文传递
Planning projects with scarce resources:Yesterday,today and tomorrow's research challenges 被引量:1
2
作者 mario vanhoucke 《Frontiers of Engineering Management》 2018年第2期133-149,共17页
This paper is an invited request to describe the main research challenges in the domain of resourceconstrained project scheduling. The paper is split up in three parts. In today's challenges, research endeavors th... This paper is an invited request to describe the main research challenges in the domain of resourceconstrained project scheduling. The paper is split up in three parts. In today's challenges, research endeavors that have received a significant, but still not enough, attention have been described. In tomorrow's research challenges,some promising research avenues for future research have been given. Finally, in yesterday's challenge, a research topic that started decades ago, is said to have still a huge potential in tomorrow's research agenda. This paper does not intend to give a full literature overview, nor a summary of all possible research paths. Instead, it is inspired from the author's experience in academic research and practical consultancy and it serves as a personal opinion on a nonexhaustive set of promising research avenues, rather than giving a full literature-based advice for future research directions. 展开更多
关键词 project management project scheduling resource constraints PERT/CPM RCPSP